Phase II – Site Improvements

Loading

July 2020 – The Board did a walk through of the site with the design team and construction crew. The parking lot has painted lines, stoppers, islands (future landscaping), light poles, sidewalks, drainage swells, and overflow parking available. Wright Brothers, TBC, Sunroc, and the Land Group have been instrumental throughout this phase. Drive by and take a look but please do not drive on the asphalt if possible.

Last Updated on September 22, 2022 by WECRD